Follow
Miguel Vieira
Miguel Vieira
Faculdade Engenharia ULHT (EIGeS), CEMMPRE - Universidade Coimbra; CEG-IST - Universidade Lisboa
Verified email at tecnico.ulisboa.pt
Title
Cited by
Cited by
Year
A two-level optimisation-simulation method for production planning and scheduling: the industrial case of a human–robot collaborative assembly line
M Vieira, S Moniz, BS Gonçalves, T Pinto-Varela, AP Barbosa-Póvoa, ...
International Journal of Production Research 60 (9), 2942-2962, 2022
372022
Optimal planning and campaign scheduling of biopharmaceutical processes using a continuous-time formulation
M Vieira, T Pinto-Varela, S Moniz, AP Barbosa-Póvoa, LG Papageorgiou
Computers & Chemical Engineering 91, 422-444, 2016
362016
Production and maintenance planning optimisation in biopharmaceutical processes under performance decay using a continuous-time formulation: A multi-objective approach
M Vieira, T Pinto-Varela, AP Barbosa-Póvoa
Computers & Chemical Engineering 107, 111-139, 2017
332017
A study on a Q-Learning algorithm application to a manufacturing assembly problem
M Neves, M Vieira, P Neto
Journal of Manufacturing Systems 59, 426-440, 2021
312021
A model-based decision support framework for the optimisation of production planning in the biopharmaceutical industry
M Vieira, T Pinto-Varela, AP Barbosa-Póvoa
Computers & Industrial Engineering 129, 354-367, 2019
272019
Assessment of financial risk in the design and scheduling of multipurpose plants under demand uncertainty
M Vieira, H Paulo, T Pinto-Varela, AP Barbosa-Póvoa
International Journal of Production Research 59 (20), 6125-6145, 2021
182021
Simulation-Optimization Approach for the Decision-Support on the Planning and Scheduling of Automated Assembly Lines
M Vieira, AP Barbosa-Póvoa, S Moniz, T Pinto-Varela
2018 13th APCA International Conference on Automatic Control and Soft …, 2018
152018
Integrating Simulation and Optimization for Process Planning and Scheduling Problems
M Vieira, S Moniz, B Gonçalves, T Pinto-Varela, AP Barbosa-Póvoa
Computer Aided Chemical Engineering 46, 1441-1446, 2019
102019
Assessment of biomass supply chain design and planning using discrete-event simulation modeling
H Paulo, M Vieira, BS Gonçalves, T Pinto-Varela, AP Barbosa-Póvoa
Computer Aided Chemical Engineering 51, 967-972, 2022
42022
Planning and scheduling in the biopharmaceutical industry: an overview
M Vieira, T Pinto-Varela, AP Barbosa-Povoa
Synthesis, Design, and Resource Optimization in Batch Chemical Plants, 107-126, 2015
42015
An Exact Approach to the Multi-Compartment Vehicle Routing Problem: The Case of a Fuel Distribution Company
G Baptista, M Vieira, T Pinto
Mathematics 12 (4), 527, 2024
32024
Optimisation of maintenance planning into the production of biopharmaceuticals with performance decay using a continuous-time formulation
M Vieira, S Liu, T Pinto-Varela, AP Barbosa-Póvoa, LG Papageorgiou
Computer Aided Chemical Engineering 38, 1749-1754, 2016
32016
Periodic versus non-periodic multipurpose batch plant scheduling: a paint industry case study
M Vieira, T Pinto-Varela, AP Barbosa-Póvoa
Operational Research: IO 2013-XVI Congress of APDIO, Bragança, Portugal …, 2015
32015
Risk assessment for the design and scheduling optimization of periodic multipurpose batch plants under demand uncertainty
M Vieira, H Paulo, C Vilard, T Pinto-Varela, AP Barbosa-Póvoa
Computer Aided Chemical Engineering 43, 991-996, 2018
22018
Optimal scheduling of multi-stage multi-product biopharmaceutical processes using a continuoustime formulation
M Vieira, T Pinto-Varela, AP Barbosa-Póvoa
Computer Aided Chemical Engineering 33, 301-306, 2014
22014
The Consistent Vehicle Routing Problem: An Application to the Pharmaceutical Supply Chain
M Eusébio, T Pinto, M Vieira
International Conference on Optimization, Learning Algorithms and …, 2024
12024
A Discrete-Event Simulation Approach to the Design and Planning of Biomass Supply Chains considering Technological Learning
H Paulo, M Vieira, BS Gonçalves, S Relvas, T Pinto-Varela, ...
Computer Aided Chemical Engineering 52, 1285-1291, 2023
12023
A study on the financial risk assessment in the design and scheduling of industrial plants
M Vieira, H Paulo, T Pinto-Varela, AP Barbosa-Póvoa
Welcome letter iii, 20, 2019
12019
A multi-objective approach on the optimal production and maintenance planning of biopharmaceutical processes under performance decay using a continuous-time formulation
M Vieira, T Pinto-Varela, AP Barbosa-Póvoa
FOCAPO/CPC2017 conference, Tucson AZ, USA, 2017
12017
Scheduling batch processes using the RTN discrete time formulation: a case study
M Vieira, T Pinto-Varela, AP Barbosa-Póvoa
12013
The system can't perform the operation now. Try again later.
Articles 1–20