Seguir
Ricardo JG Mateus
Ricardo JG Mateus
RCM2+ - Research Centre for Asset Management and Systems Engineering
Email confirmado em ulusofona.pt - Página inicial
Título
Citado por
Citado por
Ano
Multicriteria decision analysis (MCDA): Central Porto high-speed railway station
R Mateus, JA Ferreira, J Carreira
European Journal of Operational Research 187 (1), 1-18, 2008
1062008
Full disclosure of tender evaluation models: Background and application in Portuguese public procurement
R Mateus, JA Ferreira, J Carreira
Journal of Purchasing and Supply Management 16 (3), 206-215, 2010
782010
Optimal two-dimensional layout of industrial facilities
AP Barbosa-Póvoa, R Mateus, AQ Novais
International Journal of Production Research 39 (12), 2567-2593, 2001
622001
Optimal 3D layout of industrial facilities
AP Barbosa-Póvoa, R Mateus, AQ Novais
International Journal of Production Research 40 (7), 1669-1698, 2002
582002
A decision support system for a multi stakeholder’s decision process in a Portuguese National Forest
J Garcia-Gonzalo, J Palma, J Freire, M Tomé, R Mateus, LCE Rodriguez, ...
Forest Systems 22 (2), 359-373, 2013
372013
Optimal design and layout of industrial facilities: a simultaneous approach
AP Barbosa-Póvoa, R Mateus, AQ Novais
Industrial & engineering chemistry research 41 (15), 3601-3609, 2002
212002
Supporting multicriteria group decisions with MACBETH tools: selection of sustainable brownfield redevelopment actions
RJG Mateus, JC Bana e Costa, PV Matos
Group Decision and Negotiation 26 (3), 495-521, 2017
192017
Short and long forecast to implement predictive maintenance in a pulp industry
JA Rodrigues, JT Farinha, M Mendes, R Mateus, AM Cardoso
Eksploatacja i Niezawodność 24 (1), 2022
172022
Optimal design and layout of industrial facilities: An application to multipurpose batch plants
AP Barbosa-Póvoa, R Mateus, AQ Novais
Industrial & engineering chemistry research 41 (15), 3610-3620, 2002
122002
Avaliação multicritério da fragilidade do território no Brasil. A silvicultura no estado do Rio Grande do Sul
R Mateus, D Padilha
Finisterra 52 (104), 2017
92017
Comparison of Different Features and Neural Networks for Predicting Industrial Paper Press Condition
JA Rodrigues, JT Farinha, M Mendes, RJG Mateus, AJM Cardoso
Energies 15 (17), 6308, 2022
82022
Prediction of Sensor Values in Paper Pulp Industry Using Neural Networks
JA Rodrigues, JT Farinha, AM Cardoso, M Mendes, R Mateus
Proceedings of IncoME-VI and TEPEN 2021: Performance Engineering and …, 2022
52022
Automatic Risk Assessment for an Industrial Asset Using Unsupervised and Supervised Learning
JA Rodrigues, A Martins, M Mendes, JT Farinha, RJG Mateus, ...
Energies 15 (24), 9387, 2022
42022
Sustainable Transport: A Systematic Literature Review
J Reis, J Costa, P Marques, FS Pinto, RJG Mateus
International Conference on Flexible Automation and Intelligent …, 2024
12024
Optimal facility layout-a generic approach to process plants
AP Barbosa-Póvoa, JM Flaus, AQ Novais
IFAC Proceedings Volumes 33 (17), 873-878, 2000
12000
Simultaneous design and layout of batch processing facilities
AP Barbosa-Póvoa, R Mateus, AQ Novais
AIChE Symposium Series, 279-283, 2000
12000
Improving Regulations for Automated Design Checking Through Decision Analysis Good Practices: A Conceptual Application to the Construction Sector
RJG Mateus, FS Pinto, J Fauth, M Azenha, J Granja, R Veludo, B Muniz, ...
International Conference on Flexible Automation and Intelligent …, 2023
2023
Automatização parcial da verificação regulamentar de projetos de edificação para efeitos de licenciamento urbanístico: proposta, implementação e aplicação piloto
M Santos, LL Vieira, JLD Granja, TP Magalhães, R Mateus, M Carvalho, ...
UMinho Editora, 2022
2022
Common critical mistakes in evaluations with multiple criteria
RJG Mateus
Estudos de Homenagem ao Professor José Amado da Silva, 2017
2017
Combining multicriteria value measurement with mathematical programming for modeling complex decisions: Applications in strategic forest management planning
R Mateus
Universidade de Lisboa, 2017
2017
O sistema não pode efectuar a operação agora. Tente mais tarde.
Artigos 1–20