Seguir
Luis Guimarães
Luis Guimarães
INESC TEC, Faculdade de Engenharia, Universidade do Porto
Email confirmado em fe.up.pt
Título
Citado por
Citado por
Ano
Modeling lotsizing and scheduling problems with sequence dependent setups
L Guimarães, D Klabjan, B Almada-Lobo
European Journal of Operational Research 239 (3), 644-662, 2014
1082014
Solving a large multi-product production-routing problem with delivery time windows
F Neves-Moreira, B Almada-Lobo, JF Cordeau, L Guimarães, R Jans
Omega 86, 154-172, 2019
962019
Allocating products on shelves under merchandising rules: Multi-level product families with display directions
T Bianchi-Aguiar, E Silva, L Guimarães, MA Carravilla, JF Oliveira
Omega 76, 47-62, 2018
702018
Tactical production and distribution planning with dependency issues on the production process
W Wei, L Guimarães, P Amorim, B Almada-Lobo
Omega 67, 99-114, 2017
632017
A decision support system for the operational production planning and scheduling of an integrated pulp and paper mill
G Figueira, P Amorim, L Guimarães, M Amorim-Lopes, F Neves-Moreira, ...
Computers & Chemical Engineering 77, 85-104, 2015
572015
Annual production budget in the beverage industry
L Guimarães, D Klabjan, B Almada-Lobo
Engineering Applications of Artificial Intelligence 25 (2), 229-241, 2012
482012
The time window assignment vehicle routing problem with product dependent deliveries
F Neves-Moreira, DP Da Silva, L Guimarães, P Amorim, B Almada-Lobo
Transportation Research Part E: Logistics and Transportation Review 116, 163-183, 2018
452018
Pricing, relaxing and fixing under lot sizing and scheduling
L Guimaraes, D Klabjan, B Almada-Lobo
European Journal of Operational Research 230 (2), 399-411, 2013
452013
A long-haul freight transportation problem: Synchronizing resources to deliver requests passing through multiple transshipment locations
F Neves-Moreira, P Amorim, L Guimarães, B Almada-Lobo
European Journal of Operational Research 248 (2), 487-506, 2016
422016
Industrial insights into lot sizing and scheduling modeling
B Almada-Lobo, A Clark, L Guimarães, G Figueira, P Amorim
Pesquisa Operacional 35, 439-464, 2015
422015
Improving picking performance at a large retailer warehouse by combining probabilistic simulation, optimization, and discrete‐event simulation
M Amorim‐Lopes, L Guimarães, J Alves, B Almada‐Lobo
International Transactions in Operational Research 28 (2), 687-715, 2021
402021
Using analytics to enhance a food retailer’s shelf-space management
T Bianchi-Aguiar, E Silva, L Guimarães, MA Carravilla, JF Oliveira, ...
Interfaces 46 (5), 424-444, 2016
372016
Scheduling wafer slicing by multi-wire saw manufacturing in photovoltaic industry: a case study
L Guimarães, R Santos, B Almada-Lobo
The International Journal of Advanced Manufacturing Technology, 1-11, 2011
182011
Tackling perishability in multi-level process industries
W Wei, P Amorim, L Guimarães, B Almada-Lobo
International Journal of Production Research 57 (17), 5604-5623, 2019
162019
The multi-product inventory-routing problem with pickups and deliveries: Mitigating fluctuating demand via rolling horizon heuristics
F Neves-Moreira, B Almada-Lobo, L Guimarães, P Amorim
Transportation Research Part E: Logistics and Transportation Review 164, 102791, 2022
132022
An unsupervised approach for fault diagnosis of power transformers
L Dias, M Ribeiro, A Leitão, L Guimarães, L Carvalho, MA Matos, ...
Quality and Reliability Engineering International 37 (6), 2834-2852, 2021
92021
Resource definition and allocation for a multi-asset portfolio with heterogeneous degradation
L Dias, A Leitão, L Guimarães
Reliability Engineering & System Safety 213, 107768, 2021
92021
Alternative Mathematical Models and Solution Approaches for Lot‐Sizing and Scheduling Problems in the Brewery Industry: Analyzing Two Different Situations
TA Baldo, R Morabito, MO Santos, L Guimarães
Mathematical Problems in Engineering 2017 (1), 6754970, 2017
92017
Product line selection of fast-moving consumer goods
X Andrade, L Guimarães, G Figueira
Omega 102, 102389, 2021
82021
Annual distribution budget in the beverage industry: a case study
L Guimarães, P Amorim, F Sperandio, F Moreira, B Almada-Lobo
Interfaces 44 (6), 605-626, 2014
82014
O sistema não pode efectuar a operação agora. Tente mais tarde.
Artigos 1–20