Seguir
Brian Selvy
Brian Selvy
Zuken Vitech
Email confirmado em vitechcorp.com
Título
Citado por
Citado por
Ano
LSST: from science drivers to reference design and anticipated data products
Ž Ivezić, SM Kahn, JA Tyson, B Abel, E Acosta, R Allsman, D Alonso, ...
The Astrophysical Journal 873 (2), 111, 2019
32582019
Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)
BM Selvy, C Claver, G Angeli
Modeling, Systems Engineering, and Project Management for Astronomy VI 9150 …, 2014
172014
LSST control software component design
PJ Lotz, GP Dubois-Felsmann, KT Lim, T Johnson, S Chandrasekharan, ...
Software and Cyberinfrastructure for Astronomy IV 9913, 77-96, 2016
132016
V&V planning and execution in an integrated model-based engineering environment using MagicDraw, Syndeia, and Jira
BM Selvy, A Roberts, M Reuter, CC Claver, G Comoretto, T Jenness, ...
Modeling, Systems Engineering, and Project Management for Astronomy VIII …, 2018
92018
Systems engineering in the Large Synoptic Survey Telescope project: an application of model based systems engineering
CF Claver, BM Selvy, G Angeli, F Delgado, G Dubois-Felsmann, ...
Modeling, Systems Engineering, and Project Management for Astronomy VI 9150 …, 2014
92014
Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan
BM Selvy, C Claver, B Willman, D Petravick, M Johnson, K Reil, ...
Modeling, Systems Engineering, and Project Management for Astronomy VII 9911 …, 2016
42016
Dome seeing sensitivity analysis for LSST
K Vogiatzis, B Xin, C Claver, GZ Angeli, B Selvy
Modeling, Systems Engineering, and Project Management for Astronomy VIII …, 2018
32018
Monitoring LSST system performance during construction
B Xin, CF Claver, Ž Ivezić, L Jones, J Peterson, B Selvy, S Daniel, ...
Modeling, Systems Engineering, and Project Management for Astronomy VIII …, 2018
32018
Development of an Air Augmented Rocket Plume Test Apparatus
BM Selvy
California Polytechnic State University, 2003
32003
Systems engineering processes and tools for requirements management at the Extremely Large Telescopes
K Hardie, AC Santana, AW Serio, JC González-Herrera, B Fordham, ...
Journal of Astronomical Telescopes, Instruments, and Systems 8 (2), 021507 …, 2022
12022
An overview of the LSST system integration and commission plan (Conference Presentation)
CF Claver, K Reil, K Bechtol, A Connolly, P Ingraham, M Lopez, M Reuter, ...
Modeling, Systems Engineering, and Project Management for Astronomy VIII …, 2018
2018
Incremental Development, Verification & Integration of the Excalibur Almaz ECLSS
B Selvy, N Hahn, J Zelon
41st International Conference on Environmental Systems, 5241, 2011
2011
Cal Poly Aerospace Engineering Students Win National Aircraft Design Competition
UTAD Competition
2003
Risk & Opportunity Management Plan
V Krabbendam, B Selvy
Standard: Space Systems Verification Program and Management Process (AIAA S-117-2010)
MBDAU South, DLBN Langley, JWD MITRE
O sistema não pode efectuar a operação agora. Tente mais tarde.
Artigos 1–15