Follow
Heng Li
Title
Cited by
Cited by
Year
Quantifying the causes and costs of rework in construction
PED Love, H Li
Construction Management & Economics 18 (4), 479-490, 2000
6042000
Intelligent building research: a review
JKW Wong, H Li, SW Wang
Automation in construction 14 (1), 143-159, 2005
4912005
Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems
JKW Wong, H Li
Building and Environment 43 (1), 108-125, 2008
4612008
Using systems dynamics to better understand change and rework in construction project management systems
PED Love, GD Holt, LY Shen, H Li, Z Irani
International journal of project management 20 (6), 425-436, 2002
4482002
Construction partnering process and associated critical success factors: quantitative investigation
EWL Cheng, H Li
Journal of management in engineering 18 (4), 194-202, 2002
4082002
Contractor selection using the analytic network process
EWL Cheng, H Li
Construction Management and Economics 22 (10), 1021-1032, 2004
3832004
Establishment of critical success factors for construction partnering
EWL Cheng, H Li, PED Love
Journal of management in engineering 16 (2), 84-92, 2000
3582000
Analytic hierarchy process: an approach to determine measures for business performance
EWL Cheng, H Li
Measuring business excellence, 2001
3472001
Automatic Pixel‐Level Crack Detection and Measurement Using Fully Convolutional Network
X Yang, H Li, Y Yu, X Luo, T Huang, X Yang
Computer Aided Civil and Infrastructure Engineering 8 (10.1111/mice.12412), 1-16, 2018
3002018
Proactive behavior-based safety management for construction safety improvement
H Li, M Lu, SC Hsu, M Gray, T Huang
Safety Science 75, 107-117, 2015
2902015
Total quality management and the learning organization: a dialogue for change in construction.
PED Love, H Li, F Irani, Z
Total quality management and the learning organization: a dialogue for …, 2000
2902000
Using improved genetic algorithms to facilitate time-cost optimization
H Li, P Love
Journal of Construction Engineering and management 123 (3), 233-237, 1997
2851997
Analytic network process applied to project selection
EWL Cheng, H Li
Journal of construction engineering and management 131 (4), 459-466, 2005
2842005
Particle swarm optimization-based schemes for resource-constrained project scheduling
H Zhang, X Li, H Li, F Huang
Automation in construction 14 (3), 393-404, 2005
2822005
Determining the causal structure of rework influences in construction
PED Love, P Mandal, H Li
Construction Management & Economics 17 (4), 505-517, 1999
2781999
Concurrent engineering: a strategy for procuring construction projects
PED Love, A Gunasekaran, H Li
International Journal of Project Management 16 (6), 375-383, 1998
2731998
Detecting non-hardhat-use by a deep learning method from far-field surveillance videos
Q Fang, H Li, X Luo, L Ding, H Luo, TM Rose, W An
Automation in Construction 85, 1-9, 2018
2672018
Factor analysis-based studies on construction workplace safety management in China
DP Fang, F Xie, XY Huang, H Li
International Journal of Project Management 22 (1), 43-49, 2004
2672004
Scenarios for applying RFID technology in construction project management
W Lu, GQ Huang, H Li
Automation in construction 20 (2), 101-106, 2011
2652011
An application of bar-code system for reducing construction wastes
Z Chen, H Li, CTC Wong
Automation in Construction 11 (5), 521-533, 2002
2642002
The system can't perform the operation now. Try again later.
Articles 1–20