Follow
Alexandra Andersson
Alexandra Andersson
Verified email at hevs.ch
Title
Cited by
Cited by
Year
Status of the CLIC phase and amplitude stabilisation concept
D Schulte, A Andersson, A Dubrowskiy, F Stulle, V Arsov, G Sterbini, ...
252010
Fast phase switching within the bunch train of the PHIN photo-injector at CERN using fiber-optic modulators on the drive laser
M Csatari’Divall, A Andersson, B Bolzon, E Bravin, E Chevallay, S Döbert, ...
Nuclear Instruments and Methods in Physics Research Section A: Accelerators …, 2011
222011
Wakefield Monitor development for CLIC accelerating structure
F Peauger, A Andersson, P Girardot, R Ruber, W Farabolini, A Samoshkin, ...
182010
Design of Phase Feed Forward System in CTF3 and\ nPerformance of Fast Beam Phase Monitors
A Andersson, GB Christian, C Perry, A Ghigo, PN Burrows, J Roberts, ...
12*2013
Design of Phase Feed Forward System in CTF3 and Performance of Fast Beam Phase Monitors
PK Skowronski, A Andersson, A Ghigo, F Marcellini, PN Burrows, ...
WEOBB203, IPAC2013, 2013
122013
Electro-0ptical Bunch Profile Measurement at CTF3
R Pan, A Andersson, D Walsh, W Gillespie, S Mazzoni, W Farabolini, ...
102013
The CLIC Drive Beam Phase Monitor
F Marcellini, A Andersson, I Syratchev, D Alesini, A Ghigo
102010
RF-based electron beam timing measurement with sub-10fs resolution
A Andersson, JPH Sladen
Electronics Letters 44 (5), 341-343, 2008
72008
Design, hardware tests and first results from the CLIC drive beam phase feed-forward prototype at CTF3
J Roberts, A Andersson, PK Skowroński, PN Burrows, GB Christian, ...
these proceedings, LINAC’14, Geneva, Switzerland, 2014
62014
Precision beam timing measurement system for CLIC synchronization
A Andersson, JPH Sladen
62006
Demonstration of CLIC Level Phase Stability using a High Bandwidth, Low Latency Drive Beam Phase Feedforward System at the CLIC Test Facility CTF3
J Roberts, A Andersson, P Burrows, G Christian, R Corsini, A Ghigo, ...
7th International Particle Accelerator Conference (IPAC'16), Busan, Korea …, 2016
52016
First tests of a precision beam phase measurement system in CTF3
A Andersson, JPH Sladen
Particle Accelerator Conference, 2007. PAC. IEEE, 302-304, 2007
52007
First Results From Beam Tests of the CLIC Drive Beam Phase Feedforward Prototype at CTF3
J Roberts, A Andersson, A Ghigo, C Perry, R Corsini, P Skowroński, ...
32015
High charge PHIN photo injector at CERN with fast phase switching within the bunch train for beam combination
MC Divall, A Andersson, B Bolzon, E Bravin, E Chevallay, A Dabrowski, ...
Energy 25, 100, 2011
32011
The Drive Beam Phase Stability in CTF3 and its Relation to the Bunch Compression Factor
E Ikarios, A Andersson, F Tecker, R Corsini, T Persson, P Skowronski, ...
12013
Experimental Verification of the CLIC Two-Beam Acceleration Technology in CTF3
PK Skowronski, A Andersson, J Barranco, B Constance, R Corsini, ...
Ipac'13, 2013
12013
Aims and initial progress of TPMON task
A Andersson, JPH Sladen
12006
First Experimental Results with the CLIC Drive Beam Phase Feedforward Prototype at the CLIC Test Facility CTF3
G Christian, A Andersson, P Burrows, R Corsini, A Ghigo, F Marcellini, ...
4th International Beam Instrumentation Conference (IBIC2015), Melbourne …, 2016
2016
Experimental Verifiction of the CLIC TWO-BEAM Acceleration Technology in CTF3
B Constance_, A Andersson, F Tecker, E Ikarios, R Corsini, A Dubrovskiy, ...
2013
DESIGN OF PHASE FEED FORWARD SYSTEM IN CTF3 AND PERFORMANCE OF FAST BEAM PHASE MONITORS
PK Skowro, A Andersson, A Ghigo, F Marcellini
Shanghai, China, 2013
2013
The system can't perform the operation now. Try again later.
Articles 1–20