Follow
Emile Zankoul
Emile Zankoul
ME Civil Engineering, American University of Beirut
Verified email at aub.edu.lb
Title
Cited by
Cited by
Year
How can ‘tasks made ready’during lookahead planning impact reliable workflow and project duration?
FR Hamzeh, E Zankoul, C Rouhana
Construction management and economics 33 (4), 243-258, 2015
862015
Evaluation of agent-based and discrete-event simulation for modeling construction earthmoving operations
E Zankoul, H Khoury, R Awwad
ISARC. Proceedings of the international symposium on automation and robotics …, 2015
482015
Near-real-time optimization of overlapping tower crane operations: a model and case study
M Al Hattab, E Zankoul, FR Hamzeh
Journal of Computing in Civil Engineering 31 (4), 05017001, 2017
462017
A New Perspective of Construction Logistics and Production Control: An Exploratory Study
M Ghanem, F Hamzeh, O Seppänen, E Zankoul
International Group for Lean Construction Conference, 992-1001, 2018
442018
Crane overlap and operational flexibility: Balancing utilization, duration, and safety
M Al Hattab, E Zankoul, M Barakat, F Hamzeh
Construction Innovation 18 (1), 43-63, 2018
332018
Understanding the planner’s role in lookahead construction planning
H Abou-Ibrahim, F Hamzeh, E Zankoul, SM Lindhard, L Rizk
Production Planning & Control, 2018
322018
Removing Constraints to Make Tasks Ready in Weekly Work Planning
F Hamzeh, E Zankoul, F El Sakka
242016
Optimizing joint operation of two tower cranes through look-ahead planning and process simulation
M Al Hattab, E Zankoul, F Hamzeh
Proceedings 22nd Annual Conference of the International Group for Lean …, 2014
142014
Modeling, animating, and optimizing on-shore wind farm construction operations
E Zankoul, H Khoury
Journal of Computing in Civil Engineering 30 (6), 05016001, 2016
122016
Sensor-based planning tool for tower crane anti-collision monitoring on construction sites
JP Sleiman, E Zankoul, H Khoury, F Hamzeh
Construction Research Congress 2016, 2624-2632, 2016
112016
Simulation of on-shore wind farm construction process in lebanon
E Zankoul, H Khoury
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2014
112014
An Agent-Based Approach for Modeling the Effect of Learning Curve on Labor Productivity
H Shehwaro, E Zankoul, H Khoury
72016
CCC_implementing the construction control room on a fast-paced project: the case study of the Beirut port explosion
A Ezzeddine, L Shehab, I Srour, W Power, E Zankoul, E Freiha
International Journal of Construction Management 23 (5), 745-755, 2023
62023
Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective
M Ghanem, F Hamzeh, O Seppänen, L Shehab, E Zankoul
Frontiers in Built Environment 8, 980023, 2022
42022
A review on Internet of Things for enhancing construction equipment fleet productivity
E Zankoula, H Khourya, D Salhaba, S Antara
Proceedings of the Creative Construction Conference, 000-000, 2018
42018
Simulation, 5D Visualization and Optimization of On-shore Wind Farm Construction
E Zankoul
American University of Beirut, 2015
12015
SIMULATION, 5D VISUALIZATION AND OPTIMIZATION
EF ZANKOUL
2015
The system can't perform the operation now. Try again later.
Articles 1–17