Bernardo Brotas Carvalho
Bernardo Brotas Carvalho
IPFN-IST
Verified email at tecnico.ulisboa.pt
Title
Cited by
Cited by
Year
Major results from the first plasma campaign of the Wendelstein 7-X stellarator
RC Wolf, A Ali, A Alonso, J Baldzuhn, C Beidler, M Beurskens, ...
Nuclear Fusion 57 (10), 102020, 2017
1402017
Overview of the JET results with the ITER-like wall
F Romanelli, JETE Contributors
Nuclear Fusion 53 (10), 104002, 2013
126*2013
Overview of the JET results in support to ITER
X Litaudon, S Abduallev, M Abhangi, P Abreu, M Afzal, KM Aggarwal, ...
Nuclear Fusion 57 (10), 102001, 2017
1212017
Overview of first Wendelstein 7-X high-performance operation
T Klinger, T Andreeva, S Bozhenkov, C Brandt, R Burhenn, B Buttenschön, ...
Nuclear Fusion 59 (11), 112004, 2019
562019
Engineering aspects of the tokamak ISTTOK
CAF Varandas, JAC Cabral, JT Mendonça, MP Alonso, P Amorim, ...
Fusion Technology 29 (1), 105-115, 1996
461996
Overview of the JET preparation for deuterium–tritium operation with the ITER like-wall
E Joffrin, S Abduallev, M Abhangi, P Abreu, V Afanasev, M Afzal, ...
Nuclear Fusion 59 (11), 112021, 2019
362019
ATCA control system hardware for the plasma vertical stabilization in the JET tokamak
AJN Batista, A Neto, M Correia, AM Fernandes, BB Carvalho, ...
IEEE Transactions on Nuclear Science 57 (2), 583-588, 2010
362010
Interaction of a liquid gallium jet with the tokamak ISTTOK edge plasma
RB Gomes, H Fernandes, C Silva, A Sarakovskis, T Pereira, J Figueiredo, ...
Fusion engineering and design 83 (1), 102-111, 2008
352008
An ATCA embedded data acquisition and control system for the compass tokamak
DF Valcárcel, A Neto, J Sousa, BB Carvalho, H Fernandes, JC Fortunato, ...
Fusion Engineering and Design 84 (7-11), 1901-1904, 2009
332009
ATCA data acquisition system for gamma-ray spectrometry
RC Pereira, J Sousa, AM Fernandes, F Patrício, B Carvalho, A Neto, ...
Fusion engineering and design 83 (2-3), 341-345, 2008
332008
ATCA advanced control and data acquisition systems for fusion experiments
B Gonçalves, J Sousa, A Batista, R Pereira, M Correia, A Neto, ...
IEEE Transactions on Nuclear Science 57 (4), 2147-2154, 2010
312010
ATCA advanced control and data acquisition systems for fusion experiments
B Gonçalves, J Sousa, A Batista, R Pereira, M Correia, A Neto, ...
IEEE Transactions on Nuclear Science 57 (4), 2147-2154, 2010
312010
Diamagnetic energy measurement during the first operational phase at the Wendelstein 7-X stellarator
K Rahbarnia, H Thomsen, U Neuner, J Schilling, J Geiger, G Fuchert, ...
Nuclear Fusion 58 (9), 096010, 2018
302018
FireSignal—Data acquisition and control system software
A Neto, H Fernandes, A Duarte, BB Carvalho, J Sousa, DF Valcárcel, ...
Fusion Engineering and Design 82 (5-14), 1359-1364, 2007
292007
ITER fast plant system controller prototype based on PXIe platform
M Ruiz, J Vega, R Castro, D Sanz, JM López, G De Arcas, E Barrera, ...
Fusion Engineering and Design 87 (12), 2030-2035, 2012
272012
Exploitation of modularity in the JET tokamak vertical stabilization system
A Neto, G De Tommasi, R Albanese, G Ambrosino, M Ariola, G Artaserse, ...
Control Engineering Practice 20 (9), 846-856, 2012
272012
ITER fast plant system controller prototype based on ATCA platform
B Gonçalves, J Sousa, BB Carvalho, A Batista, A Neto, B Santos, A Duarte, ...
Fusion Engineering and Design 87 (12), 2024-2029, 2012
252012
The JET real-time plasma-wall load monitoring system
DF Valcárcel, D Alves, P Card, BB Carvalho, S Devaux, R Felton, ...
Fusion Engineering and Design 89 (3), 243-258, 2014
222014
Determination of the plasma position for its real-time control in the COMPASS tokamak
F Janky, J Havlicek, D Valcárcel, M Hron, J Horacek, O Kudlacek, ...
Fusion engineering and design 86 (6-8), 1120-1124, 2011
222011
Parallel processing method for high-speed real time digital pulse processing for gamma-ray spectroscopy
AM Fernandes, RC Pereira, J Sousa, A Neto, P Carvalho, AJN Batista, ...
Fusion Engineering and Design 85 (3-4), 308-312, 2010
222010
The system can't perform the operation now. Try again later.
Articles 1–20