H.M. Emrul Kays
H.M. Emrul Kays
Postdoctoral Research Fellow USM, Assistant Professor IUBAT
Verified email at live.iium.edu.my - Homepage
TitleCited byYear
Improvement of Workflow and Productivity through Application of Maynard Operation Sequence Technique (MOST)
ST Tuan, ANM Karim, HME Kays, A Amin, MH Hasan
International Conference on Industrial Engineering and Operations Management …, 2014
162014
Formulation of integer programming model for balancing and scheduling of production line having shared resources
HM Emrul Kays, AN Karim, M Abdesselam, A Hazza, MH Faizi, M Sarker
International Conference on Industrial Engineering and Operations Management …, 2014
6*2014
Assembly line productivity improvement as re-engineered by MOST
ANM Karim, ST Tuan, HME Kays
International Journal of Productivity and Performance Management 65 (7), 977 …, 2016
52016
An integer programming approach for balancing and scheduling in extended manufacturing environment
HME Kays, ANM Karim, MLR Varela, AS Santos, AM Madureira
2015 10th Iberian Conference on Information Systems and Technologies (CISTI …, 2015
32015
Balancing and scheduling in extended manufacturing environment
HME Kays, ANM Karim, MLR Varela, AS Santos, AM Madureira
Journal of Information Systems Engineering & Management 1, 1, 2016
22016
Forecasting demand: Development of a fuzzy growth adjusted Holt-Winters approach
M Abdesselam, AN Karim, HM Emrul Kays, RA Sarker
Advanced Materials Research 903, 402-407, 2014
22014
A Collaborative Multiplicative Holt-Winters Forecasting Approach with Dynamic Fuzzy-Level Component
HME Kays, ANM Karim, MRC Daud, LR Varela, G Putnik, JM Machado
Applied Science 8 (4), 530, 2018
12018
Impact of initial level and growth rate in multiplicative HW model on bullwhip effect in a supply chain
HME Kays, ANM Karim, M Hasan, RA Sarker
Data and Decision Sciences in Action, 357-368, 2018
12018
Scheduling and batching in multi-site flexible flow shop environments
AS Santos, AM Madureira, MLR Varela, GD Putnik, HME Kays, ...
2015 10th Iberian Conference on Information Systems and Technologies (CISTI …, 2015
12015
Formulation of an IP-based model for reactive flow-shop scheduling problem subject to arrival of new orders
M Abdesselam, AN Karim, HM Emrul Kays, MA Rahman, RA Sarker
Advanced Materials Research 1115, 616-621, 2015
12015
Assessment of Machining Cost for End-Milling of Ti-6Al-4V Titanium Alloy through RSM-Based Parametric Model
AN Karim, M Ikram, HM Emrul Kays, M Abdesselam, TL Ginta
Advanced Materials Research 903, 83-89, 2014
12014
A Goal Programming Approach for Balancing and Scheduling in Extended Manufacturing Environment
HME Kays, ANM Karim, ZR Salim
MESSAGE FROM THE CONFERENCE CHAIRS, 326, 2019
2019
Minimizing Makespan of Multimachine Production System In Flow Shop Environment by Means of Mixed Integer Programming Model
NSA Rahman, MHFA Hazza, E Kays
International Journal of Mechanical Engineering and Technology (IJMET) 9 (8 …, 2018
2018
Ranked sequence positional weight heuristic for simultaneous balancing and scheduling jobs in a distributed manufacturing environment
E Kays, A Karim, L Varela, G Putnik, P Ávila
Procedia CIRP 67, 3-7, 2018
2018
Gate-to-Gate Life Cycle Assessment for Determining Carbon Footprint of Catalytic Converter Assembly Process
ANM Karim, HME Kays, N Aisyah, ST Tuan
International Journal of Engineering Materials and Manufacture 2 (1), 16-24, 2017
2017
Propagation of Green Supply Chain Management: Hierarchy of Drivers
SNA Razak, ANM Karim, HM Emrul Kays
J. Appl. Environ. Biol. Sci. 7 (4S), 9-15, 2017
2017
Balancing and scheduling in extended manufacturing environment
HM Emrul Kays, ANM Karim, MLR Varela, AS Santos, AM Madureira
Journal of Information Systems Engineering & Management 1 (1), 55-63, 2016
2016
Balancing and Scheduling of Car Floor Subassembly Production Flow Line
HME Kays
Kulliyyah of Engineering, International Islamic University Malaysia, 2015
2015
Design of a Heuristic for Balancing a Multi-Stage Production Flow Line
HME Kays, AN Karim, MNB Tajudin, M Abdesselam
Advanced Materials Research 1115, 610-615, 2015
2015
Document details
M Abdesselam, ANM Karim, HM Emrul Kays, RA Sarker
Advanced Materials Research 903, 402-407, 2014
2014
The system can't perform the operation now. Try again later.
Articles 1–20