Seguir
Antonio Aguiar Costa
Antonio Aguiar Costa
CERIS Instituto Superior Técnico, Universidade de Lisboa
Email confirmado em tecnico.ulisboa.pt
Título
Citado por
Citado por
Ano
Bibliometric analysis and review of Building Information Modelling literature published between 2005 and 2015
R Santos, AA Costa, A Grilo
Automation in Construction 80, 118-136, 2017
3422017
Integration of LCA and LCC analysis within a BIM-based environment
R Santos, AA Costa, JD Silvestre, L Pyl
Automation in Construction 103, 127-149, 2019
2272019
Informetric analysis and review of literature on the role of BIM in sustainable construction
R Santos, AA Costa, JD Silvestre, L Pyl
Automation in Construction 103, 221-234, 2019
1592019
BIM-based life cycle assessment and life cycle costing of an office building in Western Europe
R Santos, AA Costa, JD Silvestre, T Vandenbergh, L Pyl
Building and Environment 169, 106568, 2020
1252020
Evidence of the impacts of public e-procurement: The Portuguese experience
AA Costa, A Arantes, LV Tavares
Journal of Purchasing and Supply Management 19 (4), 238-246, 2013
1022013
Can HVAC really learn from users? A simulation-based study on the effectiveness of voting for comfort and energy use optimization
P Carreira, AA Costa, V Mansur, A Arsénio
Sustainable cities and society 41, 275-285, 2018
762018
Development of a BIM-based environmental and economic life cycle assessment tool
R Santos, AA Costa, JD Silvestre, L Pyl
Journal of Cleaner Production 265, 121705, 2020
752020
Social e-business and the Satellite Network model: Innovative concepts to improve collaboration in construction
AA Costa, LV Tavares
Automation in Construction 22, 387-397, 2012
562012
BIM-based e-procurement: An innovative approach to construction e-procurement
A Aguiar Costa, A Grilo
The Scientific World Journal 2015, 2015
522015
Is the construction industry aware of supply chain management? The Portuguese contractors’ perspective
A Arantes, LMDF Ferreira, AA Costa
Supply Chain Management: An International Journal 20 (4), 404-414, 2015
502015
BIMSL: A generic approach to the integration of building information models with real-time sensor data
M Alves, P Carreira, AA Costa
Automation in Construction 84, 304-314, 2017
432017
Social e-business as support for construction e-procurement: e-procurement network dynamics
AA Costa, LV Tavares
Automation in Construction 43, 180-186, 2014
402014
Virtual reality as integration environments for facilities management: Application and users perception
P Carreira, T Castelo, CC Gomes, A Ferreira, C Ribeiro, AA Costa
Engineering, Construction and Architectural Management 25 (1), 90-112, 2018
362018
Advanced multicriteria models to promote quality and reputation in public construction e-marketplaces
AA Costa, LV Tavares
Automation in Construction 30, 205-215, 2013
332013
Supporting building automation systems in BIM/IFC: reviewing the existing information gap
R Vieira, P Carreira, P Domingues, AA Costa
Engineering, Construction and Architectural Management 27 (6), 1357-1375, 2020
242020
3I Buildings: intelligent, interactive and immersive buildings
AA Costa, PM Lopes, A Antunes, I Cabral, A Grilo, FM Rodrigues
Procedia Engineering 123, 7-14, 2015
242015
Key features of a project alliance and their impact on the success of an apartment renovation: a case study
DA Fernandes, AA Costa, P Lahdenperä
International journal of construction management 18 (6), 482-496, 2018
212018
Estudo dos impactos tecnológicos da contratação pública electrónica
LV TAVARES, MM Rosa, PM Graça, AA Costa
Lisboa: Observatório de Prospectiva da Engenharia e da Tecnologia, 2009
172009
Improving the Sustainability of the Built Environment by Training its Workforce in More Efficient and Greener Ways of Designing and Constructing Through the Horizon2020 BIMcert …
B McAuley, A Behan
Technological University Dublin, 2019
142019
2º inquérito nacional sobre contratação pública electrónica: Relatório final
LV Tavares, M Rosa, P Graça, A Costa, T Tavares
Associação Portuguesa dos Mercados Públicos (APMEP), 2011
142011
O sistema não pode efectuar a operação agora. Tente mais tarde.
Artigos 1–20