Marta Castilho Gomes
Marta Castilho Gomes
Professor at Instituto Superior Técnico, Universidade de Lisboa
Email confirmado em tecnico.ulisboa.pt - Página inicial
Título
Citado por
Citado por
Ano
Optimal scheduling for flexible job shop operation
MC Gomes*, AP Barbosa-Povoa, AQ Novais
International journal of production research 43 (11), 2323-2353, 2005
752005
Differentiating peri-urban areas: A transdisciplinary approach towards a typology
J Gonçalves, MC Gomes, S Ezequiel, F Moreira, I Loupa-Ramos
Land Use Policy 63, 331-341, 2017
362017
Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach
MC Gomes, AP Barbosa-Póvoa, AQ Novais
International Journal of Production Research 51 (17), 5120-5141, 2013
362013
Demolition waste generation for development of a regional management chain model
M Bernardo, MC Gomes, J de Brito
Waste management 49, 156-169, 2016
302016
The surface tension of cork from contact angle measurements
CMCPS Gomes, AC Fernandes
Journal of colloid and interface science 156 (1), 195-201, 1993
221993
A discrete time reactive scheduling model for new order insertion in job shop, make-to-order industries
MC Gomes, AP Barbosa-Povoa, AQ Novais
International Journal of Production Research 48 (24), 7395-7422, 2010
162010
Influence of the wettability of silicon substrates on the thickness of sol-gel silica films
MC Gomes, AC Fernandes, BS Almeida, RM Almeida
Journal of Materials Science 30 (15), 3893-3896, 1995
141995
The crew timetabling problem: An extension of the crew scheduling problem
MC Gomes, L Cavique, I Themido
Annals of Operations Research 144 (1), 111-132, 2006
122006
Machine learning approach for pavement performance prediction
P Marcelino, M Lurdes Antunes, E Fortunato, M Castilho Gomes
International Journal of Pavement Engineering, 1-14, 2019
8*2019
Scheduling of job shop, make-to-order industries with recirculation and assembly: a MILP approach
MC Gomes, A Barbosa-Povoa, AQ Novais
2008 IEEE International Engineering Management Conference, 1-6, 2008
72008
Reactive scheduling in make-to-order production systems: An optimization based approach
MC Gomes
PhD diss in Systems Engineering, 2007
72007
Defining mobility patterns in peri-urban areas: A contribution for spatial and transport planning policy
J Gonçalves, M Gomes, S Ezequiel
Case studies on transport policy 5 (4), 643-655, 2017
52017
Optimization of construction and demolition waste management: application to the Lisbon metropolitan area
MN Correia, MC Gomes, J Duque
Operations Research and Big Data, 33-40, 2015
42015
Machine learning for pavement friction prediction using scikit-learn
P Marcelino, M de Lurdes Antunes, E Fortunato, MC Gomes
EPIA Conference on Artificial Intelligence, 331-342, 2017
32017
Hazardous Materials Transportation using Bi-level Linear Programming-Case-study of Liquid Fuel Distribution
MS Rodrigues, MC Gomes, AB Gonçalves, S Shrubsall
International Conference on Operations Research and Enterprise Systems 2 …, 2015
32015
Otimização do escalonamento da produção na indústria de moldes: aplicação ao caso da GECO
BE Virgílio, MC Gomes, AB Póvoa
Parte: http://hdl. handle. net/10316.2/35906, 2014
22014
Optimal reactive scheduling of multipurpose, make-to-order industries
MC Gomes, AP Barbosa-Póvoa, AQ Novais
Computer Aided Chemical Engineering 21, 1587-1592, 2006
22006
Maintenance scheduling within rolling stock planning in railway operations under uncertain maintenance durations
L Mira, AR Andrade, MC Gomes
Journal of Rail Transport Planning & Management, 100177, 2020
12020
Development of a Multi Criteria Decision Analysis Model for Pavement Maintenance at the Network Level: Application of the MACBETH Approach
P Marcelino, ML Antunes, E Fortunato, MC Gomes
Frontiers in Built Environment 5, 6, 2019
12019
Operations Research and Enterprise Systems
B Vitoriano, D De Werra, GH Parlier
4th International Conference on Operations Research and Enterprise Systems, 2015
12015
O sistema não pode efectuar a operação agora. Tente novamente mais tarde.
Artigos 1–20