Marta Castilho Gomes
Marta Castilho Gomes
Professor at Instituto Superior Técnico, Universidade de Lisboa
Email confirmado em tecnico.ulisboa.pt - Página inicial
TítuloCitado porAno
Optimal scheduling for flexible job shop operation
MC Gomes*, AP Barbosa-Povoa, AQ Novais
International journal of production research 43 (11), 2323-2353, 2005
612005
Reactive scheduling in a make-to-order flexible job shop with re-entrant process and assembly: a mathematical programming approach
MC Gomes, AP Barbosa-Póvoa, AQ Novais
International Journal of Production Research 51 (17), 5120-5141, 2013
252013
The surface tension of cork from contact angle measurements
CMCPS Gomes, AC Fernandes
Journal of colloid and interface science 156 (1), 195-201, 1993
181993
Demolition waste generation for development of a regional management chain model
M Bernardo, MC Gomes, J de Brito
Waste Management 49, 156-169, 2016
152016
A discrete time reactive scheduling model for new order insertion in job shop, make-to-order industries
MC Gomes, AP Barbosa-Póvoa, AQ Novais
International Journal of Production Research 48 (24), 7395-7422, 2010
152010
Influence of the wettability of silicon substrates on the thickness of sol-gel silica films
MC Gomes, AC Fernandes, BS Almeida, RM Almeida
Journal of Materials Science 30 (15), 3893-3896, 1995
141995
The crew timetabling problem: An extension of the crew scheduling problem
MC Gomes, L Cavique, I Themido
Annals of Operations Research 144 (1), 111-132, 2006
132006
Differentiating peri-urban areas: a transdisciplinary approach towards a typology
J Gonçalves, MC Gomes, S Ezequiel, F Moreira, I Loupa-Ramos
Land Use Policy 63, 331-341, 2017
122017
Scheduling of job shop, make-to-order industries with recirculation and assembly: a MILP approach
MC Gomes, A Barbosa-Povoa, AQ Novais
Engineering Management Conference, 2008. IEMC Europe 2008. IEEE …, 2008
62008
Reactive scheduling in make-to-order production systems: An optimization based approach
MC Gomes
PhD diss in Systems Engineering, 2007
62007
Optimization of construction and demolition waste management: application to the Lisbon metropolitan area
MN Correia, MC Gomes, J Duque
Operations Research and Big Data, 33-40, 2015
22015
Optimal reactive scheduling of multipurpose, make-to-order industries
MC Gomes, AP Barbosa-Póvoa, AQ Novais
Computer Aided Chemical Engineering 21, 1587-1592, 2006
22006
Wetting of cork by polymeric adhesives
MH Adao, GM Cabrita, CM Gomes, BS Almeida, AC Fernandez, ...
Journal of adhesion science and technology 7 (4), 375-384, 1993
11993
Incapacidade Funcional e Ambiente Suburbano: Proposta de Tipologia para uma Relação Difícil
JM Gonçalves, MC Gomes, L Carvalho, S Ezequiel
Portuguese Journal of Public Health 35 (2), 84-100, 2017
2017
Defining mobility patterns in peri-urban areas: A contribution for spatial and transport planning policy
J Gonçalves, M Gomes, S Ezequiel
Case studies on transport policy 5 (4), 643-655, 2017
2017
Machine Learning for Pavement Friction Prediction Using Scikit-Learn
P Marcelino, M de Lurdes Antunes, E Fortunato, MC Gomes
Portuguese Conference on Artificial Intelligence, 331-342, 2017
2017
New Approach for Optimization of Construction and Demolition Waste Management: Application to the Lisbon Metropolitan Area
AR de Andrade, MC Gomes, J Duque
Congress of APDIO, the Portuguese Operational Research Society, 1-10, 2017
2017
Towards the PhD Degree: A Reflection and Discussion of the PhD Process
MC Gomes
International Conference on Operations Research and Enterprise Systems, 132-141, 2016
2016
Optimization of Production Scheduling in the Mould Making Industry
BE Virgílio, MC Gomes, AP Barbosa-Póvoa
Computational Management Science, 165-174, 2016
2016
Scheduling of job shop, make-to-order industries with recirculation and assembly: discrete versus continuous time models
MC Gomes, AP Barbosa-Póvoa, AQ Novais
MISTA 2009: 4th Multidisciplinary International Scheduling Conference …, 2009
2009
O sistema não pode efectuar a operação agora. Tente novamente mais tarde.
Artigos 1–20